All main line pipe is installed in open trench.


ISI's crew begins laying main line pipe.


Contractor gets started with main line installation. The main line pipe is the first component of the system to be installed. The main line pipe connects the pump station to the sub-mains and lateral pipes which supply the water to the sprinkler heads. All main line pipe is gasketed PVC.