MORE SNOW

The unexpected snow cover over the last month and a half  has slowed down progress. The contractor has been able to work in between snow storms and has installed over 50% of the mainline irrigation pipes. Holes 1-5,10,11,15 and 17 have mainline pipe installed. These pictures were taken last week. With rain coming and warmer temperatures expected the installation will be able to get back on schedule.