NEW PAGE HEADER

SEE THE NEWLY ADDED PUMP STATION ILLUSTRATION'S PAGE UNDER THE PAGES TAB.



Sunday, April 17, 2011

CONNECTING THE PUMP STATION


With the new screen on the intake pipe, ISI was ready to make the final connection between the mainline and the pump station. The 12" pipe coming from the pump station will feed the entire golf course.

Jimmy and Juan wrestle with the new intake screen.

The steel discharge pipe will be concreted into place.


A massive 10" isolation valve is lowered into place.


A mainline tee is positioned.



The heavy 10" and 12" ductile iron fittings have to positioned using backhoes.