NEW PAGE HEADER

SEE THE NEWLY ADDED PUMP STATION ILLUSTRATION'S PAGE UNDER THE PAGES TAB.



Monday, May 16, 2011

FAIRWAY INSTALLATION CONTINUES

The fairway sprinkler heads are being installed at a rapid pace now that we have had better weather conditions. The installation process does not need an open trench for the lateral line pipe so clean up is quicker and easier. The only holes are at pipe connections and where the new sprinkler heads and quick coupler valves are added. As soon as sprinkler heads are added to the communication wire path each sprinklers information can be scanned quickly from its barcode and uploaded to the central computer.

This sprinkler head just needs to be connected to the communication wire and then it is ready
to be backfilled.


Finishing touches on sprinkler heads and backfilling. 


Two inch HDPE tee being fused. This procedure does not require any glue or mechanical restraints.

Two inch HDPE elbow being fused.


The maintenance staff puts finishing touches on mainline trenches by adding a little topsoil and seed.


Just add water and these trench lines will heal quickly.