NEW PAGE HEADER

SEE THE NEWLY ADDED PUMP STATION ILLUSTRATION'S PAGE UNDER THE PAGES TAB.



Saturday, March 19, 2011

PUMP STATIONS ARE DELIVERED

Both pump stations arrived on March 8th after traveling from Rain Bird in Tucson, AZ. Each pump station goes through an intensive quality control sequence as it is being built. Both stations were fully assembled and tested in Tucson before they shipped to Towson. This ensures that when the pump stations reach their final destination they are ready to go when they come off the truck.


Both pump stations arrive on a flat bed truck from Tucson, AZ.

The pump stations are off loaded before they
can travel out onto the golf course.