Despite an early morning shower, ISI was able to get the large crane out onto the golf course to remove the old pump station and install the new station. To conserve resources and time the existing building was reused to house the new pump station. All of this work was done in a few hours. The 11' vertical pumps and motors had to be placed through an existing hatch in the roof. However, the two ton steel skid and components were slid through the double wide doors. The custom built pump station fit perfectly into its new home.
|
The crane crosses the golf course on mats to prevent damage to the turf. |
|
The old station is removed one piece at a time. |
|
ISI is able to lift and roll the new station through the front doors. |
|
Pushing the skid through the front door eliminates the need to
remove the roof. |
|
The motor is lowered on to the pump. |
|
The pumps are lowered through the hatch in the roof. |
|
Once inside, the skid was pushed into place using steel rollers. |
|
The station is positioned over the existing 6' wet well. |