Sunday, March 27, 2011

TIME TO STAKE THE GREENS

Part of the installation process performed by Hydro Designs and ISI is staking the location of the new sprinkler heads. Using the scale drawing prepared by Hydro Designs as a reference, the position of each sprinkler head is measured and marked with a stake on the golf course. With 95% of the main line installed it is time to begin installing laterals and sprinkler heads.


Sprinkler head positions are marked around each green.

Sprinkler head positions on the tees were marked as well.